Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 33 — Navigation and Navigable Waters · Part 127 · § 127.407

§ 127.407. Testing.

132 words·~1 min read·/us/cfr/t33/s§ 127.407·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)The operator must pressure test under paragraph
(b)of this section the transfer system, including piping, hoses, and loading arms, and verify the set pressure of the safety and relief valves---
(1)After the system or the valves are altered;
(2)After the system or the valves are repaired;
(3)After any increase in the MAWP; or
(4)For those components that are not continuously kept at cryogenic temperature, at least once each calendar year, with intervals between testing not exceeding 15 months.
(b)The pressure for the transfer system test under paragraph
(a)of this section must be at 1.1 times the MAWP and be held for a minimum of 30 minutes. \[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by USCG-2019-0444, 87 FR 5691, Feb. 2, 2022\]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.